Can a parking lot be sealcoated without closing it?
Yes. Lots are sectioned and phased so the property never fully closes, and work runs nights and weekends where tenant operations require it. Each section is out of service for 24 to 48 hours.
The same coating as a driveway, applied at a scale that has to be phased around tenants. A lot is sectioned so the property never fully closes, work runs nights and weekends where operations require it, and striping is relaid after the coating cures.
The season is closing. Book before the surface drops below about 50°F.
Step 1
A free written pavement condition assessment: measured areas, photographed defect log, remaining service life, and a repair schedule split across years.
Step 2
The lot is divided so no anchor tenant loses frontage parking on a weekend. You get the map before the crew arrives.
Step 3
Crack filling and patching first. Coating goes down only on a surface that will hold it.
Step 4
Stalls, fire lanes, ADA stalls and access aisles laid back out once the sealer has cured.
Delaware County, Pennsylvania — Brookhaven, Aston, Media, Springfield, Ridley Park, Swarthmore, Wallingford, Nether Providence and the surrounding townships. Chester County by arrangement.
Owner-operated by Sean McCullough, serving Delaware County since 2016 — 10 years.
Yes. Lots are sectioned and phased so the property never fully closes, and work runs nights and weekends where tenant operations require it. Each section is out of service for 24 to 48 hours.
Typically every one to three years, driven by traffic volume rather than the calendar. Truck routes, dock aprons and drive aisles wear far faster than perimeter parking, and a lot can reasonably be coated on different cycles by zone.
Yes — the coating covers the old lines. Restriping is part of the job and it is the point at which a non-compliant layout can be corrected rather than repeated.
Striping is the cheapest visible improvement you can make to a commercial property, and the one most likely to be non-compliant.
Read→A walk of the property, measured and photographed, returned as a written report with a prioritized repair schedule and budget figures.
Read→Patching removes a trip or tire hazard and stops water reaching the base through a hole.
Read→