Skip to content
Last call — sealcoating season is closingSealcoat needs surface temps above 50°F to cure. Once nights drop, the window is closed until spring.About 3 weeks left
FGG

Commercial · HOA & condo associations

Three bids, one scope, and a number that survives the meeting.

Boards rarely struggle to get bids. They struggle because three contractors describe three different jobs, and there is no honest way to compare them. We write bids to be compared — and we will supply the scope document even if you send it to our competitors.

Written condition report
Free
So three bids compare
One scope
We present at the meeting
In person
Serving Delaware County
Since 2016

The board year

Pavement is bought on a calendar, not on a need.

A board can only act when the cycle allows it. Here is the sequence that gets work done next summer instead of deferred another year — with where you are right now marked.

  1. You are here

    Step 1

    September – November

    Assess

    Get the property walked and a written report in hand. Damage is visible before snow covers it, and you need a documented scope before anyone talks about numbers.

    Request the free assessment.

  2. Step 2

    December – January

    Budget

    The report becomes line items in next year's budget, split into this year, next year and monitor. Boards that skip this step end up funding pavement out of reserves at the worst possible moment.

    Bring the report to the budget meeting.

  3. Step 3

    February – March

    Bid

    Collect your three bids against one written scope, so they are actually comparable. We will supply the scope document even if you are sending it to our competitors.

    Issue one scope to every bidder.

  4. Step 4

    April – August

    Schedule

    Approved work goes on the calendar. Sealcoating needs temperatures above about 50°F, so associations that vote in March get the dates they want and associations that vote in August take what is left.

    Lock dates before the peak-season backlog.

The offer

Free condition assessment, written for a board packet

A site walk, measured and photographed, returned as a written report. No charge and no obligation to book work from it.

Formatted to be photocopied into a board packet and read by volunteers who do not work in construction: plain language, photographs with locations, remaining service life per area, and budget figures split across three years.

Cost
No charge, no obligation
Turnaround
Agreed when the walk is booked
You receive
Written PDF report

What the report contains

  • Measured square footage by surface, from a site walk
  • Photographed defect log — cracking, raveling, depressions, standing water
  • Trip-hazard and ADA path-of-travel notes with locations
  • Drainage observations and where water is sitting
  • Remaining service life estimate for each area
  • Repair schedule split into this year, next year, and monitor
  • Line-item budget figures you can hand to a board or an owner

The report is yours regardless of who does the work. If it says the pavement has four good years left, that is what it will say.

How to read three bids

What a comparable bid actually states.

Use this against every bid you receive, including ours. If a line is missing, the difference in price is probably hiding there.

Line itemHow we state itWhat to watch for
Square footageMeasured on site and stated in the bidA bid with no square footage cannot be compared to anything.
Surface preparationCleaning method and crack repair specified separately, with linear feetPrep folded into a lump sum is where a low bid hides.
Material and coatsProduct named, number of coats stated, coverage rate given"Commercial grade sealer" is not a specification. Ask what and how many.
Crack repairHot-applied rubberized, priced by linear footCold pour costs less and fails inside a season.
StripingStall count, paint type, ADA stalls and access aisles itemizedRestriping "as existing" repeats non-compliant layouts.
ExclusionsWritten out, so the change order conversation happens before the workA bid with no exclusions has them anyway — you just have not read them yet.

Take the scope, whoever you hire

Ask for the scope document and issue it to all three bidders. We would rather lose a fair comparison than win an unfair one — and an association that gets a real comparison usually calls back in three years, which is the only timeline that matters in this business.

Multi-year

Why associations sign three-year agreements.

Not for the discount, though there is one. For the fact that pavement stops being an annual argument.

The re-bid disappears

No collecting three bids every spring for a board whose composition changed in January. The plan is already approved and funded.

Work gets staged, not deferred

Crack sealing in year one, sealcoat in year two, striping refresh in year three — sequenced properly instead of everything landing at once when something finally fails.

The number is knowable

Fixed for three years, or CPI-adjusted if you prefer. Either way the reserve line stops being a guess.

Procurement

Documents your management company will ask for.

Boards are usually the ones chasing paperwork from a contractor. Here it is in advance, with turnaround times.

  • Certificate of Insurance (COI)

    On request

    Additional insured endorsement on request

  • W-9

    On request

    Current tax year, signed

  • PA contractor registration

    On request

    Provided with the agreement

  • Commercial references

    On request

    Three, with contact permission

  • Sample condition report

    On request

    Redacted, from a comparable property

  • Safety / MSDS sheets

    On request

    For every material used on site

Insurance and registration

Certificates of insurance and Pennsylvania contractor registration are provided on request, with current carriers and limits shown on the certificate itself.

Certificates naming your entity as additional insured are issued on request, with current limits shown on the certificate. If your management company has a required form, send it — we'll complete theirs rather than sending ours.

Answers

What boards ask.

Will you present to our board?

Yes, in person, at no cost. Boards make decisions by consensus in a meeting, and a written bid alone rarely survives the questions a board will have. We walk through the report, take questions from residents if the meeting is open, and leave the packet behind.

We are required to get three bids. Does that work for you?

It is how it should work. The problem is not the three bids, it is that boards usually receive three documents describing three different jobs. We will give you a written scope you can issue to every bidder — including the other two — so the numbers you compare are actually comparable.

Can you hold pricing across multiple years?

Yes. Multi-year agreements suit associations well because they take the annual re-bid off the board’s plate and let pavement work be staged deliberately rather than deferred until something fails. Term lengths and pricing are quoted after the site walk.

How does this fit our reserve study?

The report gives a remaining service life estimate per area, which is the number a reserve study needs and rarely has at any real resolution. Most reserve studies carry one line for "asphalt" against a replacement date; a condition report lets you defend deferring that date, which is usually worth more than the work itself.

When should we start if we want work done next summer?

Assess in the fall, budget in December or January, bid in February or March, schedule for spring. Associations that begin the conversation in June are competing for the last dates of a season that closes in October.

What insurance do you carry, and can you name the association?

Certificates naming the association and the management company as additional insured are issued on request. Current carriers, coverage types and limits are shown on the certificate itself, which is the document your management company will want on file anyway.

Do you have references from other associations?

Yes, with contact permission. Where possible we provide associations of comparable size to yours, since a 40-unit condo and a 400-unit community are different jobs.