Skip to content
Last call — sealcoating season is closingSealcoat needs surface temps above 50°F to cure. Once nights drop, the window is closed until spring.About 3 weeks left
FGG

Rapid Response · Maintenance agreement

A response window you can hold us to.

Most pavement contracts are a price for work already decided on. This is the opposite: a commitment about how fast we answer when something on your property becomes a problem — plus the annual assessment that means fewer things do.

Committed response windows
In writing
Annual condition assessment
Included
Ahead of non-agreement work
Priority
Cold-weather repair included
Year-round

The windows

What we commit to in writing.

These are the numbers in the agreement. They are measured from a written request during the work week, and they are the reason the product exists.

Request types covered by a Rapid Response agreement. Response windows are set in the written agreement.
Request typeRapid Response
Safety hazardOpen pothole, trip hazard, exposed base, blocked fire laneSet in agreement
Service requestNon-urgent defect reported by a tenant, resident or inspectionSet in agreement
Scheduled workApproved repairs placed on the scheduleSet in agreement
Assessment report deliveryWritten condition report after a site walkSet in agreement

Response windows are committed in the written agreement and confirmed per property, because a lot with three tenants and a lot with forty are not the same obligation. Ask for current terms. Sealcoating is always weather-dependent — it goes down when the surface will hold it.

Scope

Covered, and not covered.

The right-hand column is the important one. An agreement that lists only what it includes is describing a brochure; this is what actually arrives, and what still gets quoted separately.

Covered by the agreement

  • Committed response windows, in writing, for every request type
  • One full pavement condition assessment each year, with an updated written report
  • Priority scheduling ahead of non-agreement work during peak season
  • Rubberized crack sealing up to the annual linear-foot allowance
  • Pothole patching and trip-hazard remediation as needed for safety
  • Certificate of insurance maintained and reissued on renewal without asking
  • A named contact who has walked your property and does not need it re-explained
  • Annual budget forecast for the following year, delivered before your budget season

Not covered — quoted separately

  • Sealcoating — scheduled and priced separately, and only when temperatures allow
  • Full-depth sawcut and base repair beyond the safety-remediation scope
  • New asphalt, overlay and resurfacing
  • Complete restriping and layout changes, as opposed to touch-up
  • Snow and ice operations of any kind
  • Damage from third-party work, utility cuts, or vehicle fluid spills
  • Drainage and stormwater structures, catch basins and concrete curbing

The annual crack-sealing allowance is set from the condition report at signing, so a property with 400 linear feet of cracking is not paying for a property with 4,000. Work beyond the allowance is quoted at member rates.

Winter

Winter is when the agreement earns its keep.

Sealcoating stops when the surface drops below about 50°F. The damage does not stop — it accelerates, because water sitting in an open crack expands every time it freezes.

Crack sealing

Hot-applied rubberized sealant keeps water out of the base. Done before a freeze it is maintenance; done after, it is patching.

Pothole patching

Freeze-thaw opens potholes fastest in February. Trip and tire hazards get remediated inside the safety window regardless of month.

Planning

Reports written in winter give you a documented scope before spring bidding opens, and dates locked before the peak-season backlog forms.

How it works

Four steps, and the first one is free.

  1. 01

    The walk

    We walk the property with you or on our own, measure it, and photograph every defect. This is the free assessment — it happens whether or not an agreement follows.

  2. 02

    The report

    You get a written PDF: measured areas, a photographed defect log, remaining service life, and repairs split into this year, next year and monitor.

  3. 03

    The number

    The agreement is priced off that report — square footage, condition and how much crack sealing the property actually needs. Not a package tier you get sorted into.

  4. 04

    The year

    Requests come in by email or phone and are answered inside the committed window. One assessment a year keeps the report current, and the budget forecast lands before your budget season.

The offer

Start with the assessment, not the agreement

Nobody should sign a maintenance agreement for a property that has not been measured. The walk and the written report come first, at no charge, and the agreement is priced off what they find.

If the report shows the pavement is in good shape, the honest recommendation is a smaller agreement or none at all. Call (610) 510-6622 and ask for the walk.

Cost
No charge, no obligation
Turnaround
Agreed when the walk is booked
You receive
Written PDF report

What the report contains

  • Measured square footage by surface, from a site walk
  • Photographed defect log — cracking, raveling, depressions, standing water
  • Trip-hazard and ADA path-of-travel notes with locations
  • Drainage observations and where water is sitting
  • Remaining service life estimate for each area
  • Repair schedule split into this year, next year, and monitor
  • Line-item budget figures you can hand to a board or an owner

The report is yours regardless of who does the work. If it says the pavement has four good years left, that is what it will say.

Answers

Questions about the agreement.

What is Rapid Response?

An annual pavement maintenance agreement for commercial properties in Delaware and Chester County. It puts committed response windows in writing, and includes an annual condition assessment, priority scheduling ahead of non-agreement work, and cold-weather crack and pothole repair. Windows and inclusions are set in the agreement.

How is it priced?

Off the condition report, not off a tier. Price is a function of total square footage, current pavement condition, and the crack-sealing allowance the property needs. Portfolios are priced across the portfolio rather than per site.

Is sealcoating included?

No, and that is deliberate. Sealcoating is a scheduled capital item priced by square foot, and rolling it into a maintenance fee would either inflate the fee for properties that do not need it yet or under-fund the ones that do. Agreement holders get priority scheduling and member pricing on it.

What counts as a safety hazard?

An open pothole, a trip hazard, exposed base course, or anything blocking a fire lane. Those are prioritized ahead of scheduled work under an agreement. If you are not sure whether something qualifies, report it and we will classify it — nobody is penalized for over-reporting.

Does it run through winter?

Yes, and winter is when it earns its keep. Crack sealing, pothole patching and trip-hazard remediation all run in cold weather. Freeze-thaw is what turns a sealed crack into a failed base, so the months when sealcoating is impossible are exactly the months when the repair work matters most.

What is the term, and can we cancel?

Agreements run annually, with multi-year terms available for portfolios. Either party can decline renewal at the end of a term. We do not use automatic multi-year rollovers.

We already have a contractor. Why change?

You may not need to. Start with the free assessment — it is written to be useful regardless of who does the work, and if it says your current contractor is keeping the pavement in good condition, that is what it will say. Plenty of assessments end there.